CB 150

The climbing system, CB150 is a basic climbed system that economical service on crane-lifted climbing projects.

Crane-operated formwork for vertical concrete members:

  • Safe working conditions provided by fully railed-in 1.50 m wide working platform
  • Safe up-and-down access between platforms provided by integrated ladder system.
  • Small number of suspension points, thanks to the brackets’ high load-bearing capacity
  • Less crane-time needed, as the climbing scaffold and formwork are moved up as a single unit
  • Simple adjustment options for precise horizontal and vertical alignment of the formwork.

CB 150 with AlpiMax Panel System

CB 150 with AlpiMax Panel System

Anchoring Place after pouring and inside of formwork

Upper Elevations

Anchoring and Wall Connection Places for the next elevations